Log In

CUBE Commissioning

PART II: Structuring Projects and Digital Twins

About This Program

This course is part of the CUBE Commissioning Full Training Program, designed to help you master every stage of the project execution workflow using the CUBE platform.

The full training consists of seven parts. While each part can be taken individually, we highly recommend completing all five to ensure a complete understanding of the platform and unlock the full potential of CUBE.

Each session includes:

• Self-paced video resources
• One-on-one coaching with a CUBE Expert Coach
• Hands-on practice using your own projects or sample files

Start with the part that fits your current needs—or follow the full program from beginning to end for the most impactful learning experience.

Course Curriculum

Session 5 – Adding Areas, Systems, and I/O Configurations

Code: CX-03

Goal: Build a strong, scalable structure for commissioning execution.

  • Defining and creating Areas and Systems within a project
  • Importing system templates from the CUBE Library
  • Configuring I/O (Input/Output) setup for seamless field commissioning
  • Techniques for preparing large, multi-building structures efficiently
Learn More
Session 6 – System Replication and Batch Naming Strategies

Code: CX-04

Goal: Enable faster project setup by leveraging system templates and naming automation.

  • How to replicate multiple similar systems across large sites
  • Exporting systems to Excel, batch editing names, and re-importing
  • Avoiding common pitfalls when working with large replication tasks
  • Best practices for maintaining data integrity across replicated systems
Learn More
Session 7 – Synchronizing Systems and Managing Devices

Code: CB-03

Goal: Create Digital Twins by matching engineering devices with real BMS systems.

  • Synchronization workflows between CUBE Engineering and live BMS
  • Handling device mismatches, missing addresses, or vendor inconsistencies
  • Manual linking techniques for unrecognized devices
  • Updating device metadata for improved analytics later
Learn More
Session 8 – Tagging Objects and Activating Fault Detection

Code: CB-04

Goal: Prepare Digital Twins for real-time operational monitoring and Auto-Commissioning.

  • Tagging protocols for points: Inputs, Outputs, Calculated Points
  • Normalizing point names and values across different manufacturers
  • Best practices for activating Fault Detection analytics
  • Field examples: Reviewing real fault triggers and diagnostics
Learn More
Go Back to CUBE Commissioning Full Training